Image

AUTHORITY ENGINEERING SERVICES

Rehabilitation and upgradation of NH-565 from existing Km. 361/330 (Dornala T Junction) to Km 420/800 (Penchalakona Junction) to two lane with paved shoulders on EPC mode in the state of Andhra Pradesh.

Image

DETAILED ENGINEERING SERVICES

Construction of 2 lane with hard shoulders of Pfutsero - phek road on Epc mode from existing Km. 40.090 to Km. 65.30 (design Km. 40.000 to 62.558 Design Length 22.558 Km. )) in the state of Nagaland under SARDP/NE.

Image

DETAILED ENGINEERING SERVICES

Construction of Two lane with Hard shoulders of Chakabama-Zuheboto Road on EPC mode from existing Km. 52.370 to Km. 79.040 (Design Km. 50.000 to Km 75+000 Design Length 25.00 Km) in the state of Nagaland under SARDP-NE.

Image

DETAILED ENGINEERING SERVICES

Construction od Two lane with Hard Shoulders of Chakabama-Zuheboto Road on EPC mode from existing Km. 79.040 to Km. 100.345 (Design Km. 75+000 to Km. 95+000) (Design Length -20.000 Km) in the state of Nagaland.

Image

DETAILED ENGINEERING SERVICES

Construction of 2 lane with hard shoulders of Pfutsero - phek road on Epc mode from existing Km. 19.90 to Km. 40.090 (design Km. 20.000 to 40.000 Design Length 20.00Km. )) in the state of Nagaland under SARDP/NE.

Image

DETAILED ENGINEERING SERVICES

Construction of Two lane with Hard shoulders of Chakabama-Zuheboto Road on EPC mode from existing Km. 100.345 to Km. 122.250 (Design Km. 95.000 to Km 115+5340 Design Length 20.534 Km) in the state of Nagaland under SARDP-NE

Image

DETAILED ENGINEERING SERVICES

Rehabilitation and Upgradation of NH-167 from Designkm.157.707 (Alinagar) to km. 187.723 (Miryalaguda) to Two lane with paved shoulders in the state of Telangana onEngineering, Procurement & Construction (EPC) Basis Contract.

Image

DETAILED ENGINEERING SERVICES

Construction of 4 Lane ROB & Approaches in Lieu of L.C.No. 102/3E at Km. 10/02-03 between Chandragiri Road and Tirupati West Railway Stations on Pakala - Tirupati Railway Section at Km.281+200 on NH-205 in the state of Andhra Pradesh on EPC mode

Image

DETAILED ENGINEERING SERVICES

Two Laning with paved shoulders from Ex. Km. 506/100 to Ex. Km. 508/700 and Ex. Km. 518/700 to Ex. Km. 534/350 Mangalore to Thiruvannamalai Road of NH-75 (Old NH-234) in Andhra Pradesh.

Image

DETAILED ENGINEERING SERVICES

Construction of Four Laning of Balachara to Harangajo section of NH-54(Ext) from Km. 275.000 to Km. 244.000 in the state of Assam on Engineering, Procurement & Construction (EPC) mode.

Image

DETAILED ENGINEERING SERVICES

Construction of Two - Lane with Hard Sholders of Khupa - Hayualiang - Hawai Road (NH-113) from design Km. 0.000 (Khupa) to 17.000 (Existing Km. 95.800 of Khupa - Hayuliang Road to Km. 8.970 Hayuliang - Hawai Road) (17.000 Km.) in the state of Arunachal Pradesh under SARDP-NE - Package 1

Image

DETAILED ENGINEERING SERVICES

Construction of Two - Lane with Hard Shoulders of Existing Hayuliang - Hawai Road on EPC Basis from design Km. 17.000 (Khupa) to 34.000 (Existing Km. 16.950 to Km. 34.310 (Hyuliang - Hawai Road)) (17.000 Km) in the state of Arunachal Pradesh under SARDP-NE - Package 2

Image

DETAILED ENGINEERING SERVICES

Construction of Two - Lane with Hard Shoulders of Existing Hayuliang - Hawai Road on EPC basis from design Km. 34.000 to 51.825 (Existing Km. 26.625 to Km. 45.050 (Hayuliang - Hawai Road)) (17.825 Km.) in the state of Arunachal Pradesh under SARDP-NE - Package 3.

Image

DETAILED ENGINEERING SERVICES

Construction of Two - Lane with Hard Shoulders of Hayuliang - Hawai Road (NH-113) from design Km. 51.825 to 63.131 (existing Km. 45.050 of Hayuliang - Hawai town) (11.306 Km.)on EPC Basis in the state of Arunachal Pradesh under SARDP-NE - Package 4.